What are the main matters needed in the operation process of double shaft shredder?
Double shaft shredder belongs to large shredding equipment, when using the operation, there are a lot of matters needing attention, at this time, the shredding machine needs to be standardized operation, so today we will analyze the matters needing attention.
What are the main matters needed in the operation process of double shaft shredder
1, the distribution platform of the double shaft shredder should enable the operator to see the operation of each department. The distribution table of electric mixer should be padded with rubber sheet or dry board, which should be firmly fastened.
2. Check the transmission organization, operating equipment, brakes, etc. of the double shaft shredder to ensure normal operation. The big gear ring, belt pulley and other parts should be equipped with protective cover.
3, double shaft shredder aggregate standard should be consistent with the function of the mixer.
4, the double shaft shredder to the big ring, runway wear, rolling parts add lubricating oil.
5, double shaft shredding machine empty operation. The operation and braking of all operating equipment shall be admitted as normal before operation. Do not put your head or hand into the hopper and the frame to investigate or probe the feeding situation.
6. When feeding the double shaft shredder, hands or tools shall not be used in the operation to stretch into the mixing cylinder to strip the material and discharge the material, and it is prohibited to operate or travel under it.
7. When the hopper of the double shaft shredder rises, the pillow cushion of the hopper should be set at the bottom of the pit, and the hopper must be fastened with a chain when finishing the pit.
8, the double shaft shredder to mixing drum feeding should be carried out in the operation, adding new material must first be the original concrete in the mixer all out of the ability to carry out, not halfway stop or start the mixer when the full load.